Archives

Displaying both unit system in surface schedules

Sometimes you need to display both unit system (Imperial & Metric) say for example in a room schedule.

Create a schedule that display the project units (Imperial in this example). I renamed the Area header for Area Imperial.

Create a calculated value and name it Area Metric. Enter Area in the Formula field.

. . . → Read More: Displaying both unit system in surface schedules

A little subtlety in the Railing design

Some of you might not remember that there is various options for a Railing sketch… especially when attached to a stair.

Take that Railing for example

By default the way it slope is set to By Host

But you can change that option to Flat or Sloped. Flat in that example will look like . . . → Read More: A little subtlety in the Railing design